Completed Projects

 

 

List of Some Completed Projects
(Click here for On-going Projects)
PROJECT / LOCATION
SCOPE OF WORK
CLIENT
DATE STARTED
EXPECTED D.O.C.
ROHM ELECTRONICS PHILS., INC. Carmona, Laguna
Supply of labor, materials, tools, equipment, consumable and supervision for the complete local fabrication, mechanical & electrical installation of 1x4.2 MW NIEGATA DIESEL #7 POWER PLANT EXPANSION.

TOSHIBA PLANT KENSETSU CO., LTD./ ENT PHILS., INC.

NOV. 2000

MAR. 2001

WU KONG(S) PTE., LTD. CEPZ, Rosario, Cavite
Supply of labor, materials, tools, equipment, consumable & supervision for the complete fabrication, erection & installation of Warehouse Steel Structures with an approximate weight of 500 Tons..
WU KONG(S) PTE., LTD.
AUG. 2000
NOV. 2000
ROHM ELECTRIC PHILS., INC. POWER PLANT Carmona, Laguna
Supply of labor,materials ,tools, equipment, consumable & supervision for the complete local fabrication, mechanical & electrical installation of 1x4.2 MW NIEGATA DIESEL #6 POWER PLANT EXPANSION.
TOSHIBA PLANT KENSETSU CO., LTD. / ENT PHILS., INC.
MAY 2000
AUG. 2000
PREPARATION & EXTRACTION 250 TPD Bagong Ilog, Pasig City
Supply of labor,materials, tools, equipment, consumable & supervision for the construction of building & installation of equipment with a nominal capacity of 250 MPTD of Soyabeans.
UNIVERSAL ROBINA CORPORATION
MAR. 1999
JUNE 2000
CAMALIG CEMENT PLANT Camalig, Albay
Supply of labor, tools, equipment, consumable & supervision for the mechanical installation work for Packhouse Systems & Limestone Crushing System.
GOODFOUND ENG'G. & CONST., CORP. PHILIPPINES
AUG. 1999
APR. 2000
SAMSUNG ELECTRO MECHANICS PHILS., CORP. PROJECT CPIP, Calamba, Laguna
Supply of labor, tools, equipment, consumable & supervision for the fabrication, & installation of Ducting, Piping & Plumbing for SAMSUNG-SEP Plant.
SUNG DO ENGINEERING CO., LTD.
OCT. 1999
MAR. 2000
APO-1 CEMENT PLANT UPGRADING Naga, Cebu
Supply of labor, tools, equipment, consumable & supervision for the Refractory Works Preheater.
GOODFOUND ENGINEERING & CONST., CORP. PHILS.
DEC. 1998
APR. 1999
HOLLAND PACIFIC POWER PLANT Dasmarinas, Cavite
Supply of labor, materials, tools, equipment, consumable and supervision for the electrical installation of 2.79 MW Wartsila diesel generating set.

LINBERG PHILS. INC.

FEB. 1998

JUL. 1998

50 MW SPPC POWER PLANT Alabel, Gen. Santos City
Supply of labor, tools, equipment, consumable for the installation of 5x10 MW Wartsila diesel generating set.
TOSPLANT PHILS. CORP.
JUL.. 1997
FEB. 1998
100 MW WMPC POWER PLANT Sangali, Zamboanga City
Supply of labor, tools, equipment, consumable for the installation of 10x10 MW Wartsila diesel generating set. This includes installation of 9,600 L.M. or 6,700,000 dia. inch of pipeline for raw cooling water, treated water, fuel oil, lube oil, waste oil, steam, starting air and de-sox.
TOSPLANT PHILS. CORP.
FEB. 1997
DEC. 1997
OIL REFINERY PLANT Sasa, Davao City
Supply of labor, tools, equipment, consumable for the fabrication & installation of 11 units product tanks with a total capacity of 13,880 M.T.
INTERNATIONAL COPRA EXPORT CORP.
MAY. 1997
DEC. 1997
CAR MANUFACTURING SHOP FACILITIES Sta. Rosa, Laguna
Fabrication-installation of top coat and surfacer both, bumper line and piping works for water circulationsystem.
NISSAN MOTORS PHILIPPINES(FEISCO)
AUG. 1996
FEB. 1997

OLEO CHEMICAL PLANT - Jose Panganiban, Camarines Norte

Fabrication-installation of 28 units intermediate stainless tank, capacitie ranging from 50 cu.m. to 1,000 cu.m. & 10 units mild steel tanks, cap. ranging from 120, 1,000 & 2,000 cu.m.
PRIMO OLEO CHEMICAL PLANT
SEP. 1995
JAN. 1997